Apply for a new electricity (BESCOM) connection

Get a new domestic power connection through BESCOM's online application with ownership and ID proof.

WhatsApp
Authority
BESCOM
Mode
Online
Time
7–30 days after document verification
Cost
Connection + meter + security deposit (varies by load)

Steps

  1. 1

    Apply online

    Use the BESCOM online new-connection service and fill the application with the sanctioned load you need.

  2. 2

    Upload documents

    Attach ownership, ID and the wiring completion certificate from a licensed electrician.

  3. 3

    Estimation

    BESCOM inspects and issues a cost estimate for cabling, meter and deposit.

  4. 4

    Pay the estimate

    Pay online; book the meter installation.

  5. 5

    Meter installation

    A BESCOM team installs the meter and energises the connection.